WRK All Residential Commercial/Industry/Institutional Mixed-Use/Family
Renata Face
—117 Adams Street, Brooklyn, US
Designed for a young and ambitious facial Surgeon in NYC, with the ultimate goal to aim for a sense of calmness to counterbalance the frantic speed of a city, any city. Natural yet warm curated material palette, a perfect marriage with the sophisticated scents that furnish and calmly define this crafted environment.
KBN has overseen both, Structural and Architectural Design, managing compliance with the Authorities having Jurisdiction.
Galia Lahav
—66 South Audley Street, London, UK
A bespoke transformation in London's prestigious Mayfair district, where architectural design and fashion artistry converge. Within the historic South Audley Street space, floating circular lighting and sculptural arches create a backdrop worthy of the house's couture collections.
The space unfolds as a curated journey, where innovative display elements harmonize with intimate styling suites. Honed travertine and brushed brass detailing provide quiet sophistication, while considered lighting design transforms each moment into a celebration of craftsmanship.
KBN has overseen both Architectural Design and Compliance, managing all aspects of the project. This collaboration continues with Galia Lahav's upcoming global headquarters in Tel Aviv.
DKN Ready Mix
—270 Green Street, Brooklyn, US
A modern concrete batching facility in Brooklyn delivering essential infrastructure for the city's construction industry. The 25,000 sq ft site combines automated production systems with support facilities designed for continuous operation.
The project integrates industrial components - including silos, aggregate bins and conveyor systems - with dedicated maintenance areas and office spaces. Site optimization and specialized foundations support the facility's heavy equipment while meeting stringent urban industrial requirements.
KBN has coordinated the project's full scope from initial concept through phased construction. Phase 1 completion achieved in 2024, with final delivery in 2025.